Dear Friends:Welcome to My Shop,Products are the Best Quality,Guarantee 100%,all Products are in Stock,do not Worry About Anything Installation Method 1. Surface Cleaning: Available Cloth Dipped in Alcohol Wipe Before Pasting After Drying Alcohol 2. Product Paste: Pre-Installation Required to Install the Product Must be Placed on the Site Than Good, Determine the Location of the Installation, the Film Will Tear off the Back of the Red Double-Sided Adhesive is Heated, and then Paste. After Pasting the Pressing Need to use Appropriate Force to Ensure Full Contact Adhesive Surface and Wetting Note: Before Installing Make Sure There is no Moisture or Body Oils, try not to Touch Within 24 Hours After the Product and Paste Parts of Water and Large Dust Can Achieve the Best Bonding Effect. Before Installing the Product Make a Test, to Start the Installation to Ensure Installation, Otherwise the Rebate Does not Change.Thank You for Understanding Tips: Friends, Your Goods are Dispatched by the China, Usually 10-20 Days to Arrive, Can the Usps Official Website, Timely Logistics Information to Track Status. Please be Patient and Wait for the Receipt, Thank You for Your Understanding
Trustpilot
2 months ago
3 weeks ago